Control after production :
Based on the aims determined for quality control section which is providing the highest quality, each profile that has not managed to successfully pass the previous quality control stages must be separated from other profiles. Profiles that successfully pass all quality control stages go under the following tests:
1. Initial inspection
2. Flattening testing
3. Central inspection
4. Hydrostatic testing
5. Ultrasonic testing of seam welding of HAZ area and also both ends of profiles
6. Final inspection
During these stages all requirements of DIN and ASTM standards and also every extra need of the customers are considered and in case of least contradiction with the specifications of standards they are immediately removed from the production line and the inspection stages increase.
Customer Inspection
In customer inspection section an appropriate space is provided for customer inspection after all machines and before the loading zone. This space let the customer to control each pipe based on the contract specifications. .